Reaps Moss Wind Farm

 

Partnerships for Renewables is operating the 3-turbine windfarm on behalf of

owners, Reaps Moss Limited.

A A A Print

Image Gallery

T1, the third and last turbine being completed

 

 

Rotor Assembly for T3 ready for lifting

 

First turbine deliveries arriving on 4th June

 

Preparing a foundation for concrete pouring

 

Laying a foundation steelwork

 

Concrete foundation pour

 

Laying the access road

 

Preparation for concrete pour at T1 base

 

Completed T1 base with foundation can in place

 

Earth mat being installed  at T2

 

Construction of the 'floating road' from the site entrance to the turbine locations

 

Aggregate laid to form the base of the new access road

 

Laying out the first crane pad

 

Substation foundation