Reaps Moss Wind Farm

 

Partnerships for Renewables is operating the 3-turbine windfarm on behalf of

owners, Reaps Moss Limited.

A A A Print

Planning Application

The planning applications for the Reaps Moss Wind Farm were granted in late 2012 by both Rossendale Borough Council and Calderdale Borough Council.  Although the planning applications were originally for four turbines, this was amended to three later in the application process, through the submission of Further Environmental Information.   

Planning applications documents

To access all the planning application documents, please click on the hyperlinks below.  A particularly useful starting point is the Non-Technical Summary (NTS) which summarises the main points of each chapter of the Environmental Statement. 

Supplementary information

A Traffic Management Plan (TMP) was drawn up for the site and agreed with both local authorities (Rossendale BC and Calderdale MBC) and also Lancashire County Council.   It is designed to ensure that the local community experiences a minimum of disturbance during the transportation of construction materials and components to site.

If you would like to see the details, this document can also be found below:

Downloads

Last updated on: 10/27/2014