Crook Hill Wind Farm

 

Partnerships for Renewables is operating the 11-turbine windfarm on behalf of

owners, Crook Hill Properties Limited.

A A A Print

Planning Application

The planning application for the Crook Hill Wind Farm was granted in 2011 following an appeal by previous owner and developer, Coronation Power.  

Planning applications documents

To access all the planning application documents, please click on the hyperlinks below.  A particularly useful starting point is the Non-Technical Summary (NTS) which summarises the main points of each chapter of the Environmental Statement. 

Supplementary information

A Traffic Management Plan (TMP) was drawn up for the site and agreed with all three local authorities (Rossendale BC, Rochdale MBC, Calderdale MBC) and Lancashire County Council in July 2013.   It is designed to ensure that the local community experiences a minimum of disturbance during the transportation of construction materials and components to site.

Another important post-planning document is the Habitat Restoration Plan, which again has been drawn up to fulfil a planning condition required by all three Local Planning Authorities.  The Plan sets out a programme of post-construction land and habitat restoration works across the site, together with the details of an agreed monitoring regime. 

Downloads of these two document can also be found below:

Downloads

Last updated on: 5/26/2015